Monday 26 April 2010

AO - Evaluation Planning

For our evaluation of the opening sequence, we are looking to film a directors interview. The interview will have both Josh and I in, and we will be answering the questions together. We will only film four out of the seven questions in the interview, the rest will be answered in a powerpoint presentation. In the presentations Josh will be answering question one, where as I'll be answering questions three and six. The interview will involve Josh and I talking about the answers, and how we feel it went.

Friday 23 April 2010

Monday 19 April 2010

AO-Third Shoot

We have finished our third shoot, for our film opening. We were filming in the basement under the stage at school, the same location as we filmed in before. Most of the shots that we filmed were filler shots, as we need to make our sequence longer, because it is too short at the moment.

The shoot was a success, as we were able to shoot all the shots that we needed and they looked to be what we wanted. We will edit the shots tomorrow to see if we can include them into our opening sequence.

Tuesday 16 March 2010

Group - Sound Samples

This is the atmospheric music we have chosen to go with our film opening. We think it fits the genre because it is very tense music.
http://www.freesound.org/samplesViewSingle.php?id=34662

This is the door slam we are going to use in our piece:
http://www.freesound.org/samplesViewSingle.php?id=46076

Here are some other atmospheric music samples we have looked at:
http://www.freesound.org/samplesViewSingle.php?id=39661
http://www.freesound.org/samplesViewSingle.php?id=34141